ClarusDocs
Built by constructors, for constructors

The paperwork sorted.
The job can start.

Don't get caught out by the paperwork. Permits, RAMS and CDM documents for civil contractors.

  • Written by practitioners
  • UK law and CDM 2015
  • Instant download
  • AI-completed in minutes

Fills in your company and site details. You confirm the rest, and a competent person reviews it before use.

Save with a document pack

Editable Word templates, bundled for the job in front of you.

Drainage Site Pack

Everything for a drainage run: the RAMS, permits to dig and pump, service search and CAT scan record, pre-start checklist, pre-backfill inspection and pressure test record.

Includes

  • Drainage Excavation RAMS
  • Permit to Dig
  • Permit to Pump
  • Pre-Backfill Inspection Checklist
  • Drainage Pressure Test Record
  • Service Search and CAT Scan Record
  • Pre-Start Work Package Checklist

£49 + VAT

(£58.80 inc. VAT)

Save £20 on buying separately

Get the pack →

Weekend and Possession Works Pack

Permits, records and an early warning for work in a weekend or possession window

Includes

  • Permit to Access
  • Permit to Dig
  • Hot Works Permit
  • Fatigue Management Plan
  • Site Instruction Log
  • Daily Site Diary
  • Subcontractor Attendance and Output Record
  • Early Warning Notice
  • Stakeholder Notification Log

£49 + VAT

(£58.80 inc. VAT)

Save £35 on buying separately

Get the pack →

Chamber and Confined Space Pack

Risk assessment, permit, rescue plan and gas and entry log for work in manholes and chambers

Includes

  • Confined Space Permit
  • Confined Space Risk Assessment
  • Confined Space Rescue Plan
  • Gas Monitoring and Entry/Exit Log
  • Drainage Excavation RAMS
  • Permit to Pump

£45 + VAT

(£54.00 inc. VAT)

Save £21 on buying separately

Get the pack →

Also: the Quality Pack for the quality file, and Site Manager Essentials.

Free tools

View all 77 documents →

What do you need today?

See a sample first

A real page from the template, watermarked.

Keeping these records every day? ClarusPM keeps them on a tablet on site and on the office computer.

See ClarusPM →

Written by people who have used them

Built by constructors, for constructors

We have spent 25 years on major UK infrastructure — CTRL, Crossrail, Network Rail. We have filled in these forms on real jobs, under real contracts, where getting it wrong costs money. Every document on ClarusDocs comes from that experience.

We know what gets disputed

A missed CE deadline under NEC Cl.61.3 can cost six figures. A permit to dig that does not cover the right services stops a possession. We have been on both sides of these arguments. Our documents are written to protect the contractor — because that is where we have always stood.

The document. Then the proof it was used.

ClarusDocs gives you the permit or RAMS. ClarusPM records who was briefed, who signed, and when the instruction arrived. Buy the permit today. Brief it tomorrow. Have the signed copy ready if the job moves.