CDM Site Induction Record Template
Written from experience on CTRL, Crossrail and Network Rail
This site induction record template shows that every worker received a site induction before starting work, which topics were covered, and who delivered it. Up to 20 people can sign each sheet.
Completed except the facts only you know
£25 + VAT
£30 inc. VAT
- Fills in: Header details and the items to check for your project.
- Stays [TO CONFIRM]: References, names and locations you haven’t given us. Results, readings, dates and signatures are left blank.
- A competent person must review before use.
- Company logo in header
- Delivered in minutes
- Word document (.docx)
Template
£9 + VAT
£10.80 inc. VAT
Blank form — fill in yourself
- Word document (.docx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Placeholders marked [TO CONFIRM] must be completed with your site-specific details. A competent person must review before use on site.
What it's for
Under CDM 2015, the Principal Contractor must make sure every worker receives a suitable site induction, and each contractor must make sure its own workers have one where the Principal Contractor has not provided it. A signed record is the simplest evidence that it happened, and that each person heard about the site rules, the emergency arrangements and the hazards before they started.
When you need it
Every time a new worker, subcontractor operative or regular visitor starts on site, and again if the site changes significantly, for example a new phase, a new access route or new emergency arrangements. Keep the signed sheets with the project records.
Who signs it
Each person inducted signs the sign-on sheet. The person delivering the induction signs it off.
What's inside
- Project, date and the name of the person delivering the induction
- A checklist of ten topics: project overview, CDM duty holders, site rules, emergency procedures and muster point, welfare, traffic management, permits to work, RAMS briefings, accident and near miss reporting, and environmental controls
- A 20-row sign-on sheet
- Sign-off by the person delivering the induction
FAQ
- Does a CSCS card replace a site induction?
- No. A card shows general training. The induction covers the risks, rules and arrangements on this site.
- How long should an induction take?
- Long enough to cover the topics properly for this site. It usually takes longer on complex sites than on simple ones.
- Do visitors need an induction?
- Yes, one proportionate to where they will go and what they will be exposed to, or they should be escorted.
- What is [TO CONFIRM]?
- Details only you know, such as references, names and locations. We never guess these. They appear as highlighted [TO CONFIRM] placeholders, and the form opens with a list of every one. Results, readings, dates and signatures are left blank for completion at the time.
- Can I edit the document?
- Yes. Both options are Word documents you can edit freely.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Related documents
- Health and Safety File — Index and Cover SheetThe front sheet and contents list for the file the client keeps after handover
- Pre-Construction Information ChecklistShow the client has handed over the information contractors need to plan safely
- F10 HSE Notification Guide and ChecklistKnow when your project must be notified to HSE, and have everything ready to do it
- CDM Appointment Letters PackThe three letters that put CDM appointments in writing
- CDM Duty Holders RegisterEveryone with a CDM duty on the project, and how to reach them
- Construction Phase PlanThe Principal Contractor’s plan for running the site safely — needed before work starts
Keeping this record every day? ClarusPM keeps it on a tablet on site and on the office computer. See ClarusPM →