Pre-Construction Information Checklist
Written from experience on CTRL, Crossrail and Network Rail
This pre-construction information checklist records what the client has provided to designers and contractors about the site and the project, including ground conditions, services, existing structures and hazardous materials, and what is still missing.
Completed except the facts only you know
£25 + VAT
£30 inc. VAT
- Fills in: Header details and the items to check for your project.
- Stays [TO CONFIRM]: References, names and locations you haven’t given us. Results, readings, dates and signatures are left blank.
- A competent person must review before use.
- Company logo in header
- Delivered in minutes
- Word document (.docx)
Template
£9 + VAT
£10.80 inc. VAT
Blank checklist — fill in yourself
- Word document (.docx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Placeholders marked [TO CONFIRM] must be completed with your site-specific details. A competent person must review before use on site.
What it's for
Under regulation 4(4) of CDM 2015, the client must provide pre-construction information as soon as practicable to every designer and contractor appointed, or being considered for appointment. Designers and contractors need it to plan safely. The checklist shows what was issued, the document references, and who is chasing any gaps.
When you need it
At tender and appointment, and again whenever new information is issued. Contractors can use it to check what they have received before pricing and planning.
Who signs it
It is issued by the client or Principal Designer and signed as received by the contractor.
What's inside
- Project, PCI reference and revision
- A checklist of 12 information areas: project description, ground conditions, services, existing structures, hazardous materials, traffic, boundaries and access, ecology and environment, an existing health and safety file, emergency procedures, client contacts and any others
- Document references and comments for each
- Gaps in the information, who is obtaining it and by when
- Issue and receipt sign-off
FAQ
- Who provides pre-construction information?
- The client, with help from the Principal Designer where one is appointed.
- What if information is missing?
- Record the gap, who is getting it and by when. Contractors should raise gaps before pricing or planning the work.
- Is an asbestos survey part of it?
- Information about hazardous materials, including asbestos, is one of the items on the checklist.
- Does the checklist replace the information itself?
- No. It is a record of what was issued and when. The information itself is in the documents listed against each item, so keep them together.
- What is [TO CONFIRM]?
- Details only you know, such as references, names and locations. We never guess these. They appear as highlighted [TO CONFIRM] placeholders, and the checklist opens with a list of every one. Results, readings, dates and signatures are left blank for completion at the time.
- Can I edit the document?
- Yes. Both options are Word documents you can edit freely.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Related documents
- F10 HSE Notification Guide and ChecklistKnow when your project must be notified to HSE, and have everything ready to do it
- CDM Appointment Letters PackThe three letters that put CDM appointments in writing
- CDM Duty Holders RegisterEveryone with a CDM duty on the project, and how to reach them
- Construction Phase PlanThe Principal Contractor’s plan for running the site safely — needed before work starts
- Health and Safety File — Index and Cover SheetThe front sheet and contents list for the file the client keeps after handover
- CDM Site Induction RecordRecord that everyone was inducted before starting on site