Construction Quote Template
Written from experience on CTRL, Crossrail and Network Rail
This construction quote template gives you a quotation letter in Word and a pricing schedule in Excel. The letter sets out the scope, the price, the VAT position, what is excluded, what you have assumed, the programme, payment terms and how changes are dealt with. The schedule adds up the items and sections for you.
Template
£12 + VAT
£14.40 inc. VAT
Blank form — fill in yourself
- Zip file: Word letter (.docx) and Excel pricing schedule (.xlsx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Complete the placeholders with your own details, and have a competent person review them before use.
What it's for
Most disputes about price start with a quote that did not say what was included. Writing down the exclusions and assumptions up front, and pricing against a stated set of drawings, gives you something to point to when the job changes, and makes a change easier to price as a variation.
When you need it
When you price work for a client or main contractor, whether it is a small job or a subcontract package. Send the letter and the schedule together.
Who signs it
You sign the letter as the person quoting. The customer signs the acceptance section, or sends an order quoting your quote number.
What's inside
- Quotation letter: customer, project, quote number, date and how long the price is valid
- Scope of work, and the drawings, specification and site visit it is based on
- Price and VAT position, including wording for the domestic reverse charge
- Exclusions, and assumptions and qualifications
- Programme, payment terms and retention
- How changes will be dealt with, the terms that apply, and acceptance
- Excel pricing schedule with sections, subtotals and provisional sums
- A filled-in example pricing schedule and how-to notes
FAQ
- What is the difference between a quote and an estimate?
- A quote is a price for defined work, which the customer can accept. An estimate is a guide to the likely cost. This template is written as a quote, so it sets out exactly what the price is for.
- Why list exclusions?
- So that both sides know what is not in the price. If an excluded item is needed later, it can be priced and instructed as a change rather than argued about.
- Should the quote include VAT?
- The template shows the price excluding VAT and states the VAT position. If the domestic reverse charge applies, say so, so the customer knows VAT will not be added to your invoices.
- How long should a quote be valid for?
- That is your decision. Set a date that reflects how quickly your material and labour costs change, and re-price if the customer accepts after it.
- What are the [PLACEHOLDERS]?
- Purple text in square brackets, such as [COMPANY NAME], marks the details you fill in. Replace each one with your own details, and remove anything that doesn’t apply, before the document is used.
- Can I edit the document?
- Yes. The letter is a Word document and the schedule an Excel spreadsheet, both editable.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Example: a drainage quotation
How the main parts might read for a small car park drainage job.
Example only: illustrative content, not from a real project.
- Scope
- Excavate and lay 120 m of 150 mm drainage with three manholes, connect to the existing manhole, air test and CCTV survey, and reinstate the tarmac over the trench.
- Price
- £18,090 excluding VAT, including a £1,500 provisional sum for contaminated spoil, spent only if instructed. The domestic reverse charge applies.
- Exclusions
- Diversion of statutory services; traffic management and road space permits; work outside 8am to 6pm, Monday to Friday.
- Assumptions
- Clear access for a 13-tonne excavator; ground as described in the site investigation; work carried out in one visit of three weeks.
- Payment
- Monthly applications on the last working day of the month; 5% retention, half released at completion.
How to put the quote together
- Visit the site and list the drawings and specification revisions you are pricing.
- Build the price in the Excel schedule, section by section, with quantities and rates.
- Put anything you cannot price yet as a provisional sum.
- Fill in the letter: the scope, the total from the schedule and the VAT position.
- Write down every exclusion and assumption that affects the price.
- Set the validity date and payment terms, sign it and send both files together.
Related documents
- CIS Invoice TemplateCIS, retention and VAT worked out, with a reverse charge switch
- Variation Order and Variation LogEvery change instructed, priced and agreed in writing
- Service Search and CAT Scan RecordProof that services were searched for and scanned before digging
- Ecology Clearance RecordRecord that protected species were checked before clearing the site
- Pre-Commencement Meeting Minutes TemplateAgenda and minutes for the meeting that kicks the job off properly
- Health and Safety File — Index and Cover SheetThe front sheet and contents list for the file the client keeps after handover