Construction Policy and Management System Pack
Written from experience on CTRL, Crossrail and Network Rail
This construction policy and management system pack brings together all 36 ClarusDocs policy, procedure and management system documents in one download. It includes the Construction Health and Safety Policy Pack, the Company Policies Pack, the Integrated Management System Pack and the Rail Contractor Procedures Pack, without the duplicates you would get by buying the packs separately.
Template
£229 + VAT
£274.80 inc. VAT
Blank policy — fill in yourself
- Zip file of Word documents (.docx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Complete the placeholders with your own details, and have a competent person review them before use.
What it's for
Contractors growing into larger clients, frameworks or rail work often need the full set at once: health and safety arrangements prepared for CHAS and other SSIP assessments, the company policies clients ask for, a management system structured to align with ISO 9001, ISO 14001 and ISO 45001, and rail procedures. These documents are not produced or endorsed by CHAS or any SSIP scheme, ISO or any certification body, or Network Rail, RSSB or the Sentinel scheme.
When you need it
When you are setting up or replacing your whole document system, or when you need the IMS Pack together with the Health and Safety Pack, or with both the Company Policies and Rail packs. The Full Pack is all four packs (Health and Safety, IMS, Company Policies and Rail): 36 documents for £229, against £326 if you buy the four packs separately: you save £97.
Who signs it
The managing director signs the policies and the IMS manual. Each procedure has an approval block for a director, a document control table with the issue date and the next review date, and a revision history.
What's inside
- 10 policies (CD-POL-01 to CD-POL-10)
- 8 health and safety procedures (CD-PRO-01 to CD-PRO-08)
- The Integrated Management System Manual and 12 system procedures (CD-IMS-01 to CD-IMS-13)
- 5 rail procedures (CD-RAIL-01 to CD-RAIL-05)
- Each document once, organised in pack folders
- Word documents with [PLACEHOLDERS] for your details, a document control table and an annual review date in each
FAQ
- How much does it save?
- The Full Pack is all four packs (Health and Safety, IMS, Company Policies and Rail): 36 documents for £229, against £326 if you buy the four packs separately: you save £97.
- Will it get me through an assessment or certification?
- No pack can promise that. Assessors and certification bodies look for evidence that your business works the way your documents say, so tailor each document and put it into practice.
- Is anything duplicated?
- No. Documents that appear in more than one pack, such as the Health and Safety Policy, are included once.
- What are the [PLACEHOLDERS]?
- Purple text in square brackets, such as [COMPANY NAME], marks the details you fill in. Replace each one with your own details, and remove anything that doesn’t apply, before the document is used.
- Can I edit the document?
- Yes. Every document in the zip is a Word document you can edit freely.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Related documents
- Construction Health and Safety Policy PackYour health and safety policy and arrangements, ready to tailor
- Company Policies PackThe company policies that sit alongside your health and safety arrangements
- Integrated Management System PackOne management system for quality, environment, and health and safety
- Rail Contractor Procedures PackFive core procedures for work on or near the railway
- Permit to DigSign-off that buried services are found and marked before anyone breaks ground
- Excavation Safety Toolbox TalkA ten-minute briefing on trench safety, with a sign-on sheet for the gang