Commissioning Record Template
Written from experience on CTRL, Crossrail and Network Rail
This commissioning record template documents the commissioning and testing of each installed asset or system, such as pumps, penstocks, control panels and other plant, before it is handed over to the client.
Completed except the facts only you know
£25 + VAT
£30 inc. VAT
- Fills in: Header details and the items to check for your project.
- Stays [TO CONFIRM]: References, names and locations you haven’t given us. Results, readings, dates and signatures are left blank.
- A competent person must review before use.
- Company logo in header
- Delivered in minutes
- Word document (.docx)
Template
£9 + VAT
£10.80 inc. VAT
Blank inspection record — fill in yourself
- Word document (.docx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Placeholders marked [TO CONFIRM] must be completed with your site-specific details. A competent person must review before use on site.
Why it matters
When the dispute arrives, the question is always: what did you have in place and when? This document is the answer.
What it's for
An asset that is installed is not the same as an asset that works as designed. The commissioning record shows that pre-commissioning checks were done, that each test met its required result, who witnessed it, and what defects were found and closed. It goes into the O&M file and supports the handover.
When you need it
When each asset or system is commissioned, before handover. Use one record per asset or system, so that each can be traced through to the asset register and O&M file.
Who signs it
The witnesses sign it: the contractor, the client and, where required, the manufacturer’s representative.
What's inside
- Asset details: reference, description, location, installer and design or performance specification
- A six-point pre-commissioning checklist, including installation to drawings, connections, guards, flushing and electrical certification
- A commissioning test table with the required and actual result, and pass or fail
- A witness table
- Defects found and the action taken
- The commissioning certificate reference and the handover date
FAQ
- Does this replace the manufacturer’s commissioning sheet?
- No. Attach the manufacturer’s sheets or certificates. This record summarises the results and the sign-off in a consistent format.
- Who should witness commissioning?
- At least the contractor and the client, and the manufacturer’s representative where the warranty or specification requires it.
- What if a test fails?
- Record it as a defect, agree the action, and re-test before handover.
- Where does the record go after handover?
- Into section 8 of the O&M file, test and commissioning records, with the asset reference matching the asset register.
- What is [TO CONFIRM]?
- Details only you know, such as references, names and locations. We never guess these. They appear as highlighted [TO CONFIRM] placeholders, and the inspection record opens with a list of every one. Results, readings, dates and signatures are left blank for completion at the time.
- Can I edit the document?
- Yes. Both options are Word documents you can edit freely.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Related documents
- Health and Safety File — Index and Cover SheetThe front sheet and contents list for the file the client keeps after handover
- Snagging ListEvery snag at completion — prioritised, owned and closed
- O&M File — Cover Sheet and IndexA complete, well-structured O&M file the client can actually use
- Asset Register TemplateEvery installed asset — what, where, who maintains it and when
- Warranty and Guarantee RegisterEvery warranty in one place — with how to claim and what voids it
- Operator Training RecordShow the client’s team were trained to run what you built