O&M Manual Index and Cover Sheet
Written from experience on CTRL, Crossrail and Network Rail
This O&M manual index and cover sheet gives the operation and maintenance file a clear structure, with a project cover sheet, an eleven-section index, document control and a client receipt, so the people running the asset can find what they need.
Completed except the facts only you know
£29 + VAT
£34.80 inc. VAT
- Fills in: Header details and the items to check for your project.
- Stays [TO CONFIRM]: References, names and locations you haven’t given us. Results, readings, dates and signatures are left blank.
- A competent person must review before use.
- Company logo in header
- Delivered in minutes
- Word document (.docx)
Template
£12 + VAT
£14.40 inc. VAT
Blank form — fill in yourself
- Word document (.docx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Placeholders marked [TO CONFIRM] must be completed with your site-specific details. A competent person must review before use on site.
What it's for
An O&M file is only useful if someone can find the maintenance requirement or the warranty they need years later. The index sets out a standard structure, from project overview and as-built drawings to the asset register, maintenance, spares, test records, warranties, training and emergency procedures, and shows what has been included.
When you need it
During the project, as information is gathered, and at handover. Starting it early makes gaps obvious before Completion.
Who signs it
The client’s representative signs to confirm they have received the file. The receipt confirms handover only. It does not confirm the contents have been checked.
What's inside
- A cover sheet with project, client, contacts, Principal Contractor and completion date
- An eleven-section index with "included" and page or tab columns
- A cross-reference to the separate CDM health and safety file
- Where the as-built drawings are held, and in what format
- Document control
- Client receipt
FAQ
- Is the O&M file the same as the health and safety file?
- No. A health and safety file is required by CDM 2015 on projects with more than one contractor, and is prepared by the Principal Designer. Keep it as a separate document alongside the O&M file.
- Does the Scope make the O&M file part of Completion?
- It might. Check the Scope or specification. If the file must be delivered before Completion, it is part of Completion.
- Which other ClarusDocs templates fit into it?
- The asset register, commissioning records, warranty register and operator training record fit into sections 5, 8, 9 and 10.
- What is [TO CONFIRM]?
- Details only you know, such as references, names and locations. We never guess these. They appear as highlighted [TO CONFIRM] placeholders, and the form opens with a list of every one. Results, readings, dates and signatures are left blank for completion at the time.
- Can I edit the document?
- Yes. Both options are Word documents you can edit freely.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Related documents
- Health and Safety File — Index and Cover SheetThe front sheet and contents list for the file the client keeps after handover
- Operator Training RecordShow the client’s team were trained to run what you built
- Snagging ListEvery snag at completion — prioritised, owned and closed
- Asset Register TemplateEvery installed asset — what, where, who maintains it and when
- Commissioning RecordProve each asset works as designed before it’s handed over
- Warranty and Guarantee RegisterEvery warranty in one place — with how to claim and what voids it