ClarusDocs
← All documents
Registers

Drawing Register Template

Written from experience on CTRL, Crossrail and Network Rail

This drawing register template records every drawing issued for construction and which revision was current on any given date, so you can show exactly what you were building to when each part of the work was done.

Page 1 of the Drawing Register TemplateSee what you get →

Completed except the facts only you know

£25 + VAT

£30 inc. VAT

  • Fills in: The register header for your project.
  • Stays [TO CONFIRM]: Names and references you haven’t given us. Entry rows are left blank.
  • A competent person must review before use.
  • Company logo in header
  • Delivered in minutes
  • Word document (.docx)
Build mine →

Template

£9 + VAT

£10.80 inc. VAT

Blank register — fill in yourself

  • Word document (.docx)
  • Guidance notes included
  • Instant download
  • Use on any project

Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Placeholders marked [TO CONFIRM] must be completed with your site-specific details. A competent person must review before use on site.

What it's for

Working to a superseded drawing is a common cause of rework and disputes. The register tracks each drawing, every revision date, the current revision and status, who issued and received it, and which revisions must not be used after a given date. If questions arise later about what you were instructed to build, the register is the evidence.

When you need it

From the first drawing received for the project. Update it every time a drawing is issued or revised, and check it before each work package starts.

Who signs it

It is not signed. It is kept by the named person responsible for document control, recorded at the top of the register.

What's inside

  • Company, project and who keeps the register
  • A landscape register with drawing number, title, original issue and revision dates, current revision, status, issued by, received by, and superseded revisions
  • Revision status codes: preliminary, for construction and as built
  • A note on using the status codes in the UK National Annex to BS EN ISO 19650 where the project uses them
  • A change log

FAQ

What should happen to superseded drawings?
Withdraw them from site, or mark them clearly as superseded, so nobody builds from them by mistake.
Can I use the project’s own status codes?
Yes. If the project uses the status codes in the UK National Annex to BS EN ISO 19650, record those instead and note the convention in the register.
How does it link to the other documents?
The pre-start work package checklist asks you to confirm drawings are at the current revision against this register.
What is [TO CONFIRM]?
Details only you know, such as names, references and dates. We never guess these. They appear as highlighted [TO CONFIRM] placeholders, and the register opens with a list of every one. The entry rows are always left blank: we never invent entries, so you record them as the work goes on.
Can I edit the document?
Yes. Both options are Word documents you can edit freely.
Do I still need to review it?
Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.