RAMS Template
Written from experience on CTRL, Crossrail and Network Rail
This RAMS template puts the method statement and a full risk assessment in one Word document, for any construction task. The risk assessment follows HSE’s five steps: for each activity, the hazard, who might be harmed and how, the risk before controls, controls in hierarchy order, the risk after them, who is responsible and when to review it. It also has the scope, resources, permits, emergency arrangements and a signed briefing record.
Template
£12 + VAT
£14.40 inc. VAT
Blank RAMS — fill in yourself
- Word document (.docx)
- Guidance notes included
- Instant download
- Use on any project
Prices exclude VAT: UK customers pay 20% VAT; VAT is not charged for customers outside the UK.All documents are drafts. Complete the placeholders with your own details, and have a competent person review them before use.
Why it matters
When the dispute arrives, the question is always: what did you have in place and when? This document is the answer.
What it's for
A RAMS brings together what could go wrong on a task and how the work will be done safely, in one document the gang is briefed on. Clients and principal contractors usually ask for one before you start. Writing the sequence first, then assessing the hazards in each step, keeps the risk assessment and the method describing the same job.
When you need it
Before work starts on a task, and again whenever the method, the site conditions or the people change, after an incident, and at the review date.
Who signs it
The person who prepared it and the site manager who approves it. The principal contractor may accept it. Everyone doing the work signs the briefing record.
What's inside
- Document control, revision history and distribution
- Scope of work, legislation and guidance, and responsibilities
- Labour, plant and equipment, materials and substances
- Induction, permits and approvals checklist
- Method statement: the step-by-step sequence of work, with hold points
- Risk assessment on HSE’s five steps: activity, hazard, who might be harmed and how, initial risk, control measures in hierarchy order (eliminate, substitute, engineering, administrative, PPE), residual risk, person responsible and review date
- A filled-in example row and 10 blank rows
- 5×5 risk matrix with a likelihood and severity rating key, and risk bands
- PPE, emergency arrangements and environmental controls
- Briefing record and sign-off
FAQ
- Is a RAMS a legal requirement?
- The law does not name a document called a RAMS. Employers must make a suitable and sufficient risk assessment, and record its significant findings if they have five or more employees (Management of Health and Safety at Work Regulations 1999, regulation 3). Contractors must plan, manage and monitor their work so that it is carried out without risks to health and safety, so far as is reasonably practicable (CDM 2015, regulation 15). A RAMS is the usual way of showing both.
- What is the difference between this and the method statement template?
- This RAMS contains both: the method statement (how the work is done, step by step) and a full risk assessment (the hazards in each step, who could be harmed, the risk before and after controls). The method statement template contains the method only, and has to be read with a separate risk assessment. If you need both in one document, use this one.
- What are HSE’s five steps?
- Identify hazards, assess the risks, control the risks, record your findings, and review the controls. The risk assessment table follows them column by column. Source: HSE, Managing risks and risk assessment at work (hse.gov.uk/simple-health-safety/risk), the online version of leaflet INDG163.
- Does this RAMS template work for any task?
- Yes. It is a general layout: you fill in the scope, sequence and hazards for your task. For drainage and trench work, the drainage RAMS template is already written for that job.
- How is the risk scored?
- Likelihood and severity are each scored from 1 to 5, using the rating key in the template, and multiplied, before and after controls. The rating key and bands are a company default you can change to match your own procedure.
- What is the hierarchy of control?
- The order to choose controls in: eliminate the hazard, substitute something less hazardous, engineering controls, administrative controls, then PPE as the last resort. It follows the principles of prevention in Schedule 1 to the Management of Health and Safety at Work Regulations 1999.
- How often should a RAMS be reviewed?
- Before each new work package or site, when the method or conditions change, after an incident or near miss, and at least every 12 months.
- What are the [PLACEHOLDERS]?
- Purple text in square brackets, such as [COMPANY NAME], marks the details you fill in. Replace each one with your own details, and remove anything that doesn’t apply, before the document is used.
- Can I edit the document?
- Yes. It’s a Word document you can edit freely.
- Do I still need to review it?
- Yes. A competent person must check every document against the actual site and works before it is used. ClarusDocs gives you a complete first draft, not a substitute for that check.
Example: the filled-in row in the risk assessment
The example row included in the template, for cutting concrete kerbs with a disc cutter. Illustrative: replace it with your own task.
Example only: illustrative content, not from a real project.
| Activity and hazard | Who might be harmed and how | Initial risk | Controls, in hierarchy order | Residual risk | Responsible / review |
|---|---|---|---|---|---|
| Cutting kerbs with a petrol disc cutter: respirable crystalline silica dust | Operative cutting: breathing in dust (silicosis, lung cancer, COPD). Others nearby: dust drifting to them. | 4 × 4 = 16 (very high) | Eliminate: order kerbs and specials to suit. Substitute: block splitter where the cut allows. Engineering: water suppression on every cut. Administrative: 5 m exclusion zone, wet clean-up, task rotation. PPE: FFP3 mask (face-fit tested), eye and hearing protection. | 2 × 4 = 8 (medium) | Supervisor; review 15/12/26 or if the method changes |
How to write a RAMS with this template
- Describe the task and where it starts and ends, and list who is doing it with what plant and materials.
- Write the sequence of work as the gang will actually do it, step by step, with any hold points.
- Take each step as an activity in the risk assessment: list its hazards, and who might be harmed and how.
- Score each hazard with the rating key, add controls in hierarchy order (eliminate first, PPE last), and score it again. Do not start while any score after controls is above 9.
- Name the person responsible for each control and set a review date.
- Fill in the emergency arrangements for this site, including the nearest 24-hour A&E department.
- Have it approved, brief it to everyone doing the work, and collect their signatures.
Related documents
- Method Statement TemplateThe method only, step by step: read with a separate risk assessment
- COSHH Assessment TemplateAssess a hazardous substance before anyone uses it
- Manual Handling AssessmentAssess lifting and carrying tasks — task, load, environment, individual
- Noise and Vibration AssessmentWork out noise and vibration exposure from tools and plant, and what to do about it
- Working at Height Risk AssessmentPlan work at height the right way round: avoid, prevent, then minimise
- Construction Health and Safety Policy PackYour health and safety policy and arrangements, ready to tailor