← What’s happening on site
Writing the RAMS and briefing the gang
Before a task starts: the method written step by step, the risks assessed, and the gang briefed and signed on.
Then short, regular talks to keep the main risks in front of everyone.
Free · 10-minute talk
Excavation safety toolbox talk
A ready-to-give talk on trench safety, with a sign-on sheet for the gang.
The 8 documents for this job
Editable Word templates. Buy without an account and download straight away.
- RAMS TemplateMethod statement and full risk assessment, in one document£12 + VAT
- Method Statement TemplateThe method only, step by step: read with a separate risk assessment£9 + VAT
- Groundworks Toolbox Talk PackTwenty ten-minute talks for the gang, each with a sign-off sheet£29 + VAT
- Drainage excavation RAMSThe method statement and risk assessment for digging trenches and laying drains£15 + VATor built for you from £45
- COSHH Assessment TemplateAssess a hazardous substance before anyone uses it£9 + VATor built for you from £25
- Manual Handling AssessmentAssess lifting and carrying tasks — task, load, environment, individual£9 + VATor built for you from £25
- Working at Height Risk AssessmentPlan work at height the right way round: avoid, prevent, then minimise£9 + VATor built for you from £25
- Noise and Vibration AssessmentWork out noise and vibration exposure from tools and plant, and what to do about it£12 + VATor built for you from £29